Archive for May, 2010

What’s the difference between construction cost estimating, and construction cost engineering?

Monday, May 24th, 2010

Another great question from a 4Clicker – “What’s the difference between construction cost estimating, and construction cost engineering”?

Construction Cost Estimating” is the process/service of determining the future cost of a construction project/program for a new building, or the repair, maintenance, renovation, or renewal of an existing building ( or other physical infrastructure asset – dam, roadway, bridge…) computed on the basis of available information . The use of a reference construction cost databases (for example, RSMeans, combined with local knowledge is typically considered “best practice”.

Construction Cost Engineering” is the process/services of creating cost data (for example, reference costs, cost databases and/or costing algorithms) for the purpose of for construction, repair, maintenance, or capital planning purposes. Cost engineering is an area of engineering practice concerned with the “application of scientific principles and techniques to problems of cost estimating, cost control, business planning and management science, profitability analysis, project management, and planning and scheduling.

e4Clicks Project Estimator let’s estimators be estimators, not cost engineers.

The Value of 4Clicks’ Integration of RSMeans

Thursday, May 20th, 2010

Today’s professional estimators understand the value of a dynamic currently priced cost database. Did you know that as e4Clicks Project Estimator users you are the ONLY estimators to have access to 400,000 dynamic, up to date, currently priced line items? Every line item and modifier is completely built out in e4Clicks for them. Locate and use full line item descriptions, images, references, almost immediately. Modifiers are ready to use, you don’t have to multiple this % times that amount and this amount plus that dollar figure. Be a cost estimator not a costing engineer.

Back from SAME

Monday, May 10th, 2010

We’re back from the SAME JETC Conference.
It was great to spend some time with our friends at DWG & Associates.
My old “boss” BCE Ron Descheneaux, from Air Force at Luke AFB walked into the 4Clicks booth. Colonel Descheneaux was at Luke Air Force base in the 90′s and was instrumental in starting up SABER. This is of course where I got my first experience as a Project Manager helped initiate SABER.

It was great to trade stories and catch up on old times.

What a small world!

4Clicks Chatter May 2010 Newletter

Thursday, May 6th, 2010

Here’s our new “4Clicks Chatter” May issue. Click the button below to download a PDF of the newsletter. This insightful issue includes:

By an Estimator for Estimators
Quote of the Month
In the News
How to Make a Good Estimate
New “Blue” Paper
Development Domain
Training Class Schedule
‘Q & A’ Corner
We hope you enjoy it! As always, we’d love to hear your comments.
http://www.4-clicks.com/dl/nl/20100504.4Clicks.Chatter.pdf

See us at SAME

Monday, May 3rd, 2010

Visit us this week at booth #1357 at the Atlanta SAME conference on May 5 and 6, 2010.